Simon Dean carried out a CAT 0 lighting design proposal for Stobart Rail & Civils.
Design scope, to submit a compliant lighting design proposal for the temporary over-bridge whilst the main bridge was under refurbishment.
The design was submitted to Network Rail for approval.
Following the design review notification (DRN) and inter disciplinary checks (IDC) the design was approved for construction.
The design was a quick turn around for the team at our Head Office in Skelmersdale.
We utilised the scaffold design system, which in turn allowed efficient cable routing and containment system.
The design detail allowed for a quick installation detailing all aspects of the job down to the required fixing screws for the LED light fittings.