Simon Dean Electrical Ltd responded to our client Network Rail to install emergency generator power supplies.
We were tasked with multiple installations across a weekend as Storm Arwen caused chaos.
We installed back up Generator Power to a Station, Level Crossing and Signal Boxes across Cumbria and High Peak.
Generators where supplied, connected and fuel was managed throughout the period which saw our engineers battle sever weather to reach these critical locations.